03Construction

Progress you can measure, not argue about.

A dated reconstruction every cycle, aligned to the same control network — so earthwork volumes, install progress and as-built deviation become numbers instead of opinions.

±2%
volumetric accuracy on stockpiles
Weekly
cadence available on active sites
Auditable
record for pay applications and claims
Initialising renderer

What we fly

  • Double-grid photogrammetric mission over the full site
  • Oblique perimeter for façade and formwork detail
  • GCP-tied control network for cycle-to-cycle alignment
  • Stockpile and laydown isolation passes

What you get

  • Time-stamped 3D twin per capture cycle
  • Cut / fill and stockpile volumetrics
  • Orthomosaic and contour set for the design team
  • Progress overlay against issued-for-construction model
Next vertical
3D Surface Models