04How it runs

Five steps, one crew, a fixed quote before we mobilise.

01
Day 0

Scope

We ask what decision the model has to support. An antenna audit, a pay application and a listing need different resolutions, and pretending otherwise is how clients end up paying for data they can't use.

  • Asset type & access constraints
  • Required accuracy
  • Deliverable list
  • Fixed quote
02
Day 0–1

Plan

Airspace checked, waivers confirmed, control network designed. The flight is simulated before it is flown, so the crew arrives knowing the exact pass count and battery plan.

  • LAANC / airspace clearance
  • Mission file
  • GCP layout
  • Site safety brief
03
Day 1

Fly

Automated missions, manual detail passes where automation can't see. Coverage is verified on site — we do not leave until the imagery is proven sufficient to solve.

  • Full-coverage frame set
  • RTK-tagged imagery
  • On-site coverage QC
  • Field notes
04
Day 1–2

Solve

Alignment, densification, meshing and georeferencing. Every model is checked against surveyed points before anyone sees it, and the residuals go in the report.

  • Dense cloud
  • Textured mesh
  • Accuracy report
  • Ortho / DSM
05
Day 2

Deliver

The twin goes live on a private link, the raw files land in your storage, and the report answers the question you asked in step one.

  • Live web twin
  • Raw exports
  • Findings report
  • Archive copy

Insured & certificated

FAA Part 107 crews, $5M liability, waiver-capable for night and controlled airspace operations.

Accuracy stated, not implied

Every deliverable ships with the check-point residuals. If we missed the spec, you see it before you use it.

Your data stays yours

Raw imagery, models and reports are released to you in full. No platform lock-in, no per-seat fee to look at your own asset.